API RP 14F PDF

Find the most up-to-date version of API RP 14F at Engineering The American Petroleum Institute’s Recommended Practice for Design and Installation of Electrical Systems for Offshore Petroleum Facilities, API RP 14F, un . Nov 5, For facilities classified as Zone 0, Zone 1, or Zone 2, reference API 14FZ, Recommended Practice for Design and Installation of Electrical.

Author: Aratilar Yotilar
Country: Oman
Language: English (Spanish)
Genre: Love
Published (Last): 6 December 2011
Pages: 416
PDF File Size: 17.45 Mb
ePub File Size: 4.51 Mb
ISBN: 208-9-31195-793-2
Downloads: 42209
Price: Free* [*Free Regsitration Required]
Uploader: Vilabar

Regulators such as U. Sealing accomplished by fusion of metal to metal or sealed through glass to metal. Must provide adequately maintained breathers and drains to prevent accumulation of moisture This document provides guidelines and recommended practice for the satisfactory design of offshore structures against fire and blast loading.

Upstream – (API RP) – OCS Group

These advantages may include reduced initial capital expenditures, enhanced safety, or facilities that are more easily and more economically maintained. This document recommends minimum requirements and guidelines for the design and installation of new piping systems on production platforms located offshore.

As tested by the NFPA This document is intended to bring together in one place a brief description of basic desirable electrical practices for offshore electrical systems. Providing protection from fire, smoke, water and blast pressures. Metal-clad cable as defined by NEC Article This document recommends minimum requirements and guidelines for the design apu installation of electrical systems on fixed and floating petroleum facilities located offshore.

Zone 1 Equipment must be certified as meeting the requirements of the area this could be a number of different protection concepts not just Flame-Proof. C — Sparking equipment in which the contacts are suitably protected other than by restricted breathing. Grounding of electrical equipment on fixed and floating offshore petroleum facilities in a positive manner is of particular importance because personnel standing on steel decks or in contact with steel framing present a low impedance path to ground, effectively grounded For sizing equipment grounding conductors, refer to NEC Table.

  ADG508FB DATASHEET PDF

The practitioner should in all cases seek full and proper guidance from the relevant legislation and codes aapi practice in addition to following company guidelines and procedures.

30 CFR 250.114 – How must I install, maintain, and operate electrical equipment?

This document recommends minimum requirements and guidelines for the design and installation of new piping systems on production platforms located offshore. The classified areas are different and xpi protection concepts also differ. Medias this blog was made to help people to easily download or read PDF files.

This equipment has additional security against the possibility of excessive temperature and the equipment is assembled very carefully to ensure that arcing or sparking from part to part or connection to connection will not occur.

This document recommends minimum requirements and guidelines for the design, installation, and maintenance of electrical systems on fixed and floating petroleum facilities located offshore. Inch, size or larger r; run entering an enclosure that contains splices, taps, or terminals.

This recommended practice is intended to assist in development of a management program designed to promote safety and environmental protection during the performance of offshore oil and gas and sulphur operations. This document recommends minimum requirements and 14ff for ep design and installation of electrical systems on fixed and floating petroleum facilities located offshore. Explosion proof equipment may not provide protection against the ingress of liquids or solids therefore, breathers and drains may be required.

Safety Alerts

Must be installed in and explosion proof container unless the certificate states otherwise. This ensures that apu gas or vapor located above the arcing or sparking parts or the gas or vapor located exterior apu the enclosure cannot be ignited by the electrical arcing parts within the oil.

This is to provide a higher level of protection for their hazardous area equipment and personnel as they deem necessary. The surrounding gas air mixture can automatically pai with out a spark being formed.

All seals should be installed as close as practicable, but in no case more than 18 inches, from the enclosures to which they are attached. If Associate Apparatus is placed in the classified area then it must have another ai of protection.

  ISO TOLERANCES FOR HOLES ISO 286-2 PDF

Associated Apparatus Is apparatus that not all the circuits are intrinsically safe. Energy Limited nL Limit energy of sparks; wpi the temperature of a device replaced by Apl ic. This recommended practice covers methods of installation for pressure-relief devices for equipment that has a maximum allowable working pressure MAWP of 15 psig 1.

The procedures for installation of the aoi covered in this recommended practice are based on experience with and evaluation of many installations. Type PLTC nonmetallic-sheathed, power-limited tray cable.

This document provides guidelines and recommended practice for the satisfactory design of offshore structures against fire and blast loading. This document recommends minimum requirements and guidelines for the design and installation of electrical systems on fixed and floating petroleum facilities located offshore when ap locations are classified as Zone 0, Zone 1, or Zone 2. Its only intrinsically safe when employed in a properly designed intrinsically safe circuit.

Zone 2- Not likely or normally confined in containers. This Recommended Practice is intended to serve as a guide to crane owners and operators in developing operating and maintenance practices and procedures for use in the safe operation of pedestal-mounted revolving cranes on fixed or oating offshore platforms, jacku They accomplish this by maintaining a permanent seal.

Strict rules rl be followed, system calculated to ensure energy levels are within tolerances and diagrams must be followed closely as wells as the current RP, Codes and Standards. OK Forward looking statement. Published by Nickolas Allan Jenkins Modified about 1 month ago. About project SlidePlayer Terms of Service. Disconnect switches in general purpose enclosures should not be used offshore in classified locations; this is a departure from the NEC.