CALCOLO SOLAIO LAMIERA GRECATA PDF

e secondarie. Vista del solaio in lamiera grecata con travi in acciaio principali e secondarie Verifica fissaggio connettore: piegatura a 45° – Tecnaria. Pacchetti solaio. Cargado . G1 solaio gettato in opera esempio 20+5 = 3,00 kN/ mq oppure lamiera grecata. G2 soletta da calcolare 25*0,05 G2 = 1,25kN/mq. Find out the most recent pictures of Solaio In Acciaio E Tavelloni here, and also you E Tavelloni 60 xpx Calcolo Solaio In Acciaio EXCEL Avec Calcolo 26 xpx Solaio Solaio In Acciaio Tavelloni Lamiera Grecata Legno A.

Author: Motaxe Yodal
Country: Belgium
Language: English (Spanish)
Genre: Politics
Published (Last): 4 June 2017
Pages: 204
PDF File Size: 13.14 Mb
ePub File Size: 18.29 Mb
ISBN: 863-8-65858-339-6
Downloads: 54150
Price: Free* [*Free Regsitration Required]
Uploader: Kazragami

The consolidation of steel floors is recommended and always necessary for seismic reasons.

Solaio In Acciaio E Tavelloni

Nailed connector and welded connector July 18, Tecnaria CTF connector stud fixed through continuous sheeting: The beams rested on the main walls with a spacing usually varying from 60 to cm. After reading the instructions on how to use of the gun, the operator worked in complete safety, wearing goggles, acoustic protection and gloves, all of which are supplied together with the nail gun. In these rare cases the connectors are welded.

Technical installations cannot be inserted into the slab. Name Enabled Cookies We use Cookies to give you a better website experience. Prova di piegatura connettore Verifica fissaggio connettore: Hollow bricks or wood boarding can also be used as decking.

The solution chosen was a structure with steel columns and beams, profiled sheeting floor and connected slab. The floor structures which have been strengthened where […].

  DIALOGICALITY AND SOCIAL REPRESENTATIONS PDF

Once the profiled sheeting is in position over the steel beam, it is sufficient to solaii the high-strength nails supplied with the connector. Google Analytics We track anonymized user information to improve our website.

Floor with profiled sheeting. Factory, Vedelago (TV)

The limited size makes it most suitable for use in floors not subject to high loads and for general restoration work where a great flexibility of use is required. Other types of nailers must not be used.

Vedelago, Treviso TV Type of work: It is especially recommended for use in seismic areas. An intermediate mezzanine floor was required inside a prefabricated concrete industrial building.

The construction of new floors using the composite steel-concrete method is very beneficial in many situations, both as far as the practicality of the works, and the performance levels that can be reached with reduced thicknesses. The assembly operations did not pose any problems, because the cut-to-measure steel beams could be easily carried inside the building and put in place, creating a double-joisted metal structure.

It was decided to create a modular metal structure designed in compliance with anti-seismic requirements. In order to fasten the connector, the sheeting must adhere correctly to the beam. The simplicity of installation makes this the ideal system! Cookies We use Cookies to give you a better website experience. Profiled sheeting may be used as an alternative. The brick elements can be used as formwork for the subsequent casting if they are in good condition.

It is preferable to replace these heavy layers with aerated clay or polystyrene. Lightweight concrete can also be used. A filling layer, often using waste material from the building site, was laid on top of the structure thus obtained, to level the surface of the calcklo and provide the bed for laying the floor finish. Tecnaria connectors can be used for both new floors and for the consolidation of existing steel floors. Intradosso solaio in lamiera grecata Solaio in lamiera grecata: The nail gun is easy to use on site.

  IEC 60073 PDF

Acconsenta ai nostri cookie se solzio ad utilizzare il nostro sito greczta.

Proprietà familiare: Dimensionamento solaio lamiera grecata – Delibo

The technique proposed is well solaiio to prefabricated joist floors Baustawhile it is difficult for Sap or Varese floors, which have concrete joists of very small sizes. Solaio prima del getto di calcestruzzo Vista del solaio metallico a lavoro quasi ultimato. However, this new intermediate floor required a high loading capacity. Restoration of wood floors Steel floors Hollow bricks and concrete floor consolidation. It is not necessary to fix the mesh to the connectors. This cookie is strictly lmaiera for Cloudflare’s security features and cannot be turned off.

Strengthening of steel floor structures in Aquila, Italy. However, fixing the nail into the grecaa may create vibrations and this must be taken into account if there are elements that could be damaged e.